The claim is usually lost before anyone thinks about claiming. It is lost at the loading dock, in the four seconds it takes to sign a delivery receipt that says “received in good order”, while two crushed cartons sit at the back of the truck.

Everything that follows — the photographs, the letters, the surveyor, the months of correspondence — is an attempt to undo that signature. It almost never works. The paperwork that decides a cargo claim is created at the moment of delivery, by whoever is holding the pen.

What follows is the sequence, the four deadlines that run in parallel, and the wording that keeps the claim alive.

The claim is lost at the door

A delivery receipt is a legal document, and signing it without qualification is an admission that the goods arrived in the condition described on it. Most receipts are pre-printed with “received in good order and condition”, and most drivers hand them over while the tailgate is still coming up.

The asymmetry is brutal: the carrier’s liability for visible damage effectively ends at that signature, while the receiver’s ability to discover the damage starts only after the cartons are opened — which is later, and usually alone.

Two rules follow, and neither requires any legal knowledge. Never sign an unqualified receipt for a shipment you have not counted. And if the count or the condition is wrong, write it on the receipt itself, in the driver’s presence, before the pen leaves the paper.

Four clocks start at the same time

Cargo claims run on several deadlines at once, and they are set by different conventions depending on the mode. Missing any one of them does not weaken the claim; it ends it.

Clock Deadline Applies to If it is missed
Notation at delivery At the moment of handover All modes, visible damage or short count Goods are deemed delivered in good condition
Written notice, sea and road 3 days from delivery Damage not apparent at handover Claim is presumed invalid
Written notice, air 14 days for damage, 21 for delay Air waybill shipments Action against the carrier is barred
Time bar 1 year sea and road, 2 years air Any legal action The right to sue expires

Two things about this table catch people out. The first is that the three-day clock starts at delivery, not at discovery — so a carton opened on day five is already out of time for the notice, even though the damage is obvious. The second is that the time bar runs from delivery rather than from the end of the claim correspondence, which means a claim “in discussion” for fourteen months can expire while everyone is still writing letters.

The practical consequence: send the written notice immediately, even if the amount is not yet known. A notice that says “damage to cartons 3 and 7, extent not yet assessed, claim reserved” preserves the right. A notice sent after the survey is a notice sent too late.

What the driver will not wait for

Drivers are on a schedule and will not stand by while thirty cartons are opened. That is not obstinacy; it is the economics of the job. The notation has to be written in the ninety seconds available, which is why it should be a sentence you already know.

What works: “Received 12 of 14 cartons. Cartons 3 and 7 crushed and wet. Contents not inspected. Damage noted in driver’s presence.”

Four elements, each doing a job. The count establishes the shortage. The condition describes what was visible. “Contents not inspected” preserves the right to find more later, which is the sentence that most people omit. “In driver’s presence” establishes that the carrier had notice at the time.

What does not work: “received in good order”, “subject to inspection” written after the driver has left, or a note sent by email the next morning. All three are treated as an unqualified receipt with a later complaint attached.

If the driver refuses to accept a notation, write it anyway, photograph the receipt and the cartons together, and note the refusal in the same sentence. A notation the driver disputes is still a notation; a blank receipt is nothing.

Photographs that survive a review

Photographs are the evidence a surveyor will actually look at, and most sets are unusable because they show the damage without showing what it belongs to.

Six shots, taken before anything is moved. A wide shot of the consignment as it sits, so the carton can be located. A shot of the shipping marks and carton number, legible. A close shot of the damage with a tape measure or a coin for scale. A shot of the outer carton and the inner packaging together, because the condition of the packaging decides who is liable. A sequence of the unpacking, so the damage can be tied to a specific unit. And a wide shot of the whole quantity, because a claim for twelve units needs to show that twelve exist.

Two details make the difference between a set that is accepted and one that is argued about. Timestamps, from the camera rather than added later. And continuity: the same carton, in the same position, across several frames — which is what turns a collection of pictures into a sequence that can be checked.

Photograph before repair, before disposal, and before anything is moved to a different pallet. A carton that has been relocated cannot be shown to have been damaged where it was found.

The letter that starts the clock

The written notice does not need to be long, and it should not wait for the facts. Six elements, one page.

The shipment reference — bill of lading, air waybill or consignment number. The delivery date and the notation made at the door. A description of what was found, in the order it was found. A statement that the extent is not yet assessed and that all rights are reserved. A request for a survey or an acknowledgement. And a copy of the signed receipt with the notation, attached rather than described.

Send it to the party named on the transport document — the carrier, not only the forwarder — and keep proof of sending. A forwarder who receives the notice is not necessarily the party who has to be notified, and a notice to the wrong party can fail the three-day deadline while looking perfectly diligent.

Whose fault is it, and who pays

The most common reason a valid claim recovers nothing is that it was addressed to the wrong party. Damage has a cause, and the cause determines the defendant.

What you see Likely responsible Evidence that decides it Recovery
Outer carton crushed, contents broken Carrier — handling or stowage POD notation, photos of the carton Good, within the liability limit
Carton intact, contents damaged Shipper — insufficient packaging Condition of the packaging on arrival Poor; the carrier’s standard defence
Shortage with cartons sealed Factory — miscount at packing Packing list versus actual count Depends on the supplier agreement
Wet damage, cartons stained Carrier — container leak or condensation Whether the stain is salt or fresh water Good if the container was the carrier’s
Crushed at the base of a stack Shipper — stacking beyond carton strength Compression test rating versus load Poor

The second row is the one that decides most claims, and it is the reason packaging specifications matter more than any letter. A carrier defending a claim will argue that the goods were not packed to withstand ordinary handling, and the condition of the carton is the evidence for or against that argument. A carton that arrived intact with broken contents is very hard to win.

The categories with the highest damage rates meet this constantly. Appliance shipments run 4 to 6 per cent damage, concentrated in door skins and anything with glass, and the majority of it traces back to carton strength rather than to handling — which is why the packaging specification, not the claim letter, is where that loss is actually decided.

There is also a limit to what can be recovered at all. Sea carriage limits liability to roughly 666 units of account per package or 2 per kilogram, whichever is higher; air carriage to about 22 units of account per kilogram. On a dense, low-value cargo the limit can be a fraction of the invoice. Anything above the limit has to come from cargo insurance, which is why the premium is not the line to cut.

When the number is smaller than the fight

A claim costs time, and time has a price. Three to six months of correspondence, a survey fee, photographs, translated documents and the attention of whoever owns the problem — against a recovery that typically lands at 40 to 60 per cent of the loss.

The arithmetic that should be done before starting: if the claim is under a few hundred dollars, the internal cost of pursuing it usually exceeds the recovery. That is not a reason to sign a clean receipt; it is a reason to treat small damage as a cost of doing business and to spend the effort on packaging instead.

The comparison is stark when put on the same page. A carton upgrade that costs $0.90 a unit and halves the damage rate returns several times its cost in the first year, as the textile packing arithmetic shows. A claim recovers part of a loss that has already happened, months later. One prevents, the other administers.

For high-value cargo the calculation reverses, and insurance becomes the cheaper option than either. The premium on a container is small relative to the value, and it pays at invoice value rather than at the carrier’s liability limit — the difference between recovering 60 per cent of a loss in six months and 100 per cent in six weeks. Whether the freight rate you were quoted includes insurance is a separate question, and one worth asking when you read the quote.

A checklist to keep in the glovebox

Print this and give it to whoever receives deliveries. It is worth more than any policy document, because it is used in the ninety seconds that decide the claim.

  • Count before signing. If the count is wrong, do not sign clean.
  • Write the notation on the receipt — count, condition, “contents not inspected”, “in driver’s presence”.
  • If the driver refuses, write it anyway and photograph the receipt with the cartons.
  • Six photographs before anything moves: wide, marks, damage with scale, packaging inside and out, unpacking sequence, full quantity.
  • Email the written notice within three days (sea and road) or fourteen (air), to the carrier named on the transport document, with the receipt attached.
  • Say “extent not yet assessed, all rights reserved” in the notice, so a later survey does not restart the clock.
  • Do not repair, dispose or relocate until the survey is done or the carrier has released the goods in writing.
  • Check the time bar on the calendar — one year for sea and road, two for air — and diarise it at sixty days before.

None of this is complicated, and all of it has to happen at a moment when nobody wants to do paperwork. That is the whole problem with cargo claims: the evidence is free at the door and expensive afterwards, and the person holding the pen has no idea they are signing away the case. The demurrage clock runs the same way — started by an event nobody recorded, ended by a charge nobody expected.

The claim itself is only half of it: the evidence that decides whether it is paid is assembled at the loading door, weeks before anyone knows there is a claim.

Which is why the loading survey matters more than the photographs: wet bales are argued about as condition at loading, not as an event in transit.

One failure is specific to liquids in small sealed bodies: a cartridge that weeps in a hold damages everything beneath it, and the claim is about the goods below.

A claim is usually argued over damage, but the harder case is a shortage: when a pallet arrives with one carton missing, the claim starts from a delivery that every system calls complete.