The tender that could not be compared
Eleven carriers replied to the tender and nine of them were unusable. Not because the rates were bad — two were remarkably low — but because the spreadsheet behind them had no common unit. One carrier quoted per forty-foot container with surcharges separate; another quoted per chargeable kilogram all-in; a third quoted per shipment with a minimum that would swallow half the lanes; a fourth simply wrote “as per tariff” and attached a PDF of a rate sheet that had expired in the summer.
The buyer had run a professional process: a clear volume forecast, a lane list, a deadline, a comparison meeting. What the process produced was nine different answers to nine slightly different questions, and the decision came down to whoever could reconstruct the assumptions fastest.
This is the part of procurement that looks like administration and behaves like pricing. The bid sheet is not a form; it is the instrument that determines what a carrier is able to tell you, and therefore what you are able to compare. Reading the quotes comes later. This is about the document that produced them.
Five choices, made before anyone bids
Every bid sheet quietly answers five questions. Each answer changes the price that comes back, and none of them is about the rate level.
The unit. Per container by type, per chargeable weight, per shipment, or per lane as an all-in. A unit that does not match the cargo’s economics will be converted by the carrier — badly, in its own favour — before it is quoted.
The validity window. A rate valid for thirty days and a rate valid for twelve months are different products. If the sheet does not say which, carriers will assume the shorter one and price the renewal risk into the number.
The volume commitment. Binding, non-binding, or “forecast for information only”. A carrier that is told the volume is a forecast prices the peak; one that is given a commitment prices the average and manages the peaks itself.
The surcharge treatment. All-in, or base plus a named list of surcharges, and of those, which are capped. This single choice decides whether the bids can be compared at all.
The award rule. One carrier takes everything, or the volume is split, and if it is split, whether there is a minimum per carrier. Carriers bid differently when they know the rule, and they bid defensively when they do not.
What a badly designed sheet gets you
Carriers are not passive in the face of an unclear document. They price the ambiguity, and they do it in a consistent direction.
An unclear unit is converted to the carrier’s preferred unit, usually one that charges the buyer’s light cargo as though it were heavy. An unstated validity becomes short, with a renewal conversation attached. A non-binding volume forecast is treated as a wish and priced against the spot market, because that is what the carrier will have to buy if the wish does not materialise. An all-in bid with no surcharge list becomes an all-in bid with a paragraph of “subject to” beneath it, which is worse than separate surcharges because it is invisible until it is invoked.
And a split-award rule announced after the bids produces the most expensive outcome of all: carriers that priced for a large allocation discover they have a small one, and the small allocation is repriced at the next opportunity — politely, and with a reference to the volume they had been shown.
The three prices in the room
To read what comes back, it helps to keep three prices apart, because they are frequently confused in the same meeting.
The tariff is the carrier’s published price, the one a surcharge announcement is technically addressed to. The contract rate is what was negotiated, and it may or may not reference the tariff — this is the hinge on which most surcharge disputes turn. The spot rate is what the market clears at on a given week for a given box.
A general rate increase moves the first. Whether it reaches the second depends on a sentence in the contract. The third can move in the opposite direction on the same day, which is why a quote can double while the market is falling, and why both statements can be true.
The comparability test
There is a quick way to know whether a bid sheet is worth sending. Take two imaginary replies and try to decide which is cheaper without asking a question. If you cannot, the sheet is the problem, not the carriers.
| Bid-sheet choice | What carriers do with it | What you end up comparing |
|---|---|---|
| Unit does not match the cargo | Convert to their preferred unit | Two different cargo assumptions |
| Validity unstated | Assume short, price renewal risk | A rate and a rate-plus-option |
| Volume “for information” | Price against spot, defensively | A contract bid and a spot bid |
| Surcharges not enumerated | All-in with hidden “subject to” | Two numbers with different contents |
| Award rule published late | Bid for the allocation they hope for | Bids that will be repriced after award |
| No minimum per carrier | Bid low, serve the small lanes last | A headline rate and a service risk |
The last row is the one that costs money quietly. A carrier awarded a thin allocation on a lane it does not really serve will not refuse it; it will serve it when convenient, which is a service problem that arrives disguised as an operations problem.
What good looks like
Four things, and none of them is sophisticated.
One unit, stated once, with the conversion rule. If lanes carry different cargo types, give the conversion (volume ratio, weight break) rather than letting each carrier invent one.
A validity that matches the shipping calendar. Rates valid from the contract start, with a named review date, and a stated treatment of cargo booked before the start and shipped after it.
A surcharge schedule attached to the sheet. The list of surcharges that may apply, which are capped, and — for anything route-dependent — the definition of the trigger, in the same language used in the carbon line.
The award rule, published before the bids. How many carriers, what share, what minimum, and what happens to a carrier that underperforms. Carriers price certainty; publishing the rule is the cheapest way to buy some.
The arithmetic nobody does at the comparison meeting
When the bids come in, the meeting usually ranks them by headline rate. The ranking is almost always wrong, for a reason that is easy to fix.
Total cost is the rate times the volume on each lane, plus the surcharges that will actually be incurred, plus the cost of the volume that will not move as forecast — and the last term is the one that separates a good award from a cheap one. A carrier that is two per cent cheaper but requires a minimum volume on a lane where the forecast is soft is not cheaper; it is a commitment to pay for capacity that will not be used.
Which is why the sheet should ask for the minimum quantity per lane as a separate line, and why the decision about how much to commit is part of the tender rather than a result of it. The number a carrier gives for a committed volume and the number it gives for a forecast are not the same number with a different label; they are two different products.
When a tender is the wrong instrument
It is worth saying when none of this applies, because the process has a cost of its own and it is not small.
A tender earns its keep when there are many lanes, recurring volume and enough money at stake that a two per cent difference pays for the weeks spent on it. Below that threshold the arithmetic inverts: the design work, the comparison, the award meeting and the contract drafting cost more than the rate improvement they produce, and the buyer would have been better served by taking spot prices and keeping the flexibility.
There is a middle case that catches a lot of companies: a modest number of lanes, steady but small volume, and a strong desire to have “a contract”. That configuration usually produces a document that is careful about terms and thin on volume, and carriers respond to it accordingly — with rates that are only marginally better than spot and a willingness to walk away if the year is tight. The honest version of that position is a short fixed-rate agreement on the two or three lanes that matter, and spot for the rest.
So the expiry condition for this article is not a date. It is a size. When the spend is small enough that a bad rate is cheaper than a good process, the sheet should not be sent at all — and knowing where that line sits is part of the same discipline as designing the sheet well.
The long pole is the frozen date
Everything in a tender can be adjusted except the moment the sheet goes out.
Before that date, the unit, the validity, the surcharge list and the award rule are all free to change — they cost nothing but thought. After it, every change restarts the clock: carriers re-price, the comparison meeting moves, and the honest ones tell you why the number went up.
That asymmetry is the whole discipline. The design work is the only part of the procurement with no external constraint, which makes it the part most worth doing slowly. A sheet that takes a week longer to design and produces comparable bids is cheaper than a sheet sent on time that produces nine answers to nine questions — and the difference never shows up in the rate, only in the meeting where nobody can decide.
By the 2027 season the surcharge list will be longer than last year’s, and the number of lines that need a definition will have grown. The sheet is where that complexity is either tamed or inherited: everything you leave undefined at the top comes back as a negotiation at the bottom, and by then the fees that were never itemised will already be in the invoice.
A bid sheet that asks for the surcharge formula, not the surcharge, is answered differently: the four definitions behind a fuel line.
An award that hands the lane to a carrier on an index-linked rate is a different document from a fixed one: the tender then has to define the basis and the reading date, not just the price.
Whether devanning is priced per box or per consignment changes who orders the strip; that question belongs on the freight RFP bid sheet before the rate is signed.


