Thirty per cent, and the two ways it goes wrong
The terms looked ordinary because they were ordinary: thirty per cent deposit by telegraphic transfer, seventy per cent against a copy of the bill of lading. Every quotation the buyer received said something similar, and the supplier had signed five hundred contracts on the same page.
What the clause actually does is allocate two different risks, and it allocates both of them to the buyer. The deposit is money paid for goods that do not exist yet, and the balance is paid for goods the buyer has never seen, against a document that proves they have been loaded rather than that they are correct. Neither half of the clause is unfair. Together they mean the buyer is financing the production and accepting the quality risk, on a first order, from a supplier whose factory was visited once.
Payment terms are usually negotiated as if they were part of the price — a few points of discount in exchange for a few weeks of cash. They are better read as a risk map. Each instrument moves a specific risk to a specific party at a specific moment, and the price of the instrument is the cost of that transfer.
Four instruments, four different risks moved
The vocabulary is small and the differences matter.
Advance payment moves money before goods. The buyer’s exposure is the full amount, from the day of transfer until the day of delivery, and the risk is not only non-delivery — it is also delivery of something else. What protects the buyer is not the contract but the supplier’s existence and reputation, which is exactly what a first order has not yet established.
Payment against documents — the balance against a bill of lading copy, or through a documentary collection — moves the money to the moment when goods are on a vessel. The risk changes shape rather than disappearing: the buyer is now exposed to a shipment that exists but may not match the specification, and the documents say nothing about the goods inside the container. A bill of lading is a receipt for a sealed box.
A letter of credit substitutes a bank’s promise for the buyer’s. The bank pays when the documents comply, and it does not look at the cargo. That is the whole design, and it is why a letter of credit is expensive and why it does not solve the quality problem at all. It solves the payment problem: the seller knows it will be paid if it ships what the documents describe, and the buyer knows the money only moves against those documents.
Open account reverses the exposure. The seller ships, the buyer pays thirty or sixty days later, and the seller carries the risk of non-payment for the whole period. That risk has a price, and the price is in the quotation, whether or not the quotation says so.
The letter of credit protects the paper, not the product
Buyers new to the instrument assume it protects them against a bad shipment. It does not, and the misunderstanding is expensive because it arrives after the money has moved.
Under a credit, the bank examines documents against the terms: invoice, packing list, bill of lading, certificate of origin, inspection certificate if required. If the documents match, the bank pays. If the container holds the wrong product, the documents still match, and the bank has done exactly what it promised.
Which means the quality protection in a letter of credit comes entirely from the documents the credit requires, not from the credit itself. A credit that calls for an inspection certificate issued by a named independent body is a real control. A credit that calls for a certificate issued by the seller is a formality with a fee attached.
There is a subtler problem, and it is the one that turns credits into theatre: the soft clause. A credit that requires a certificate of acceptance signed by the buyer before payment converts the bank’s obligation back into the buyer’s discretion — which may be what the buyer wants and is not what a credit is for. Suppliers have learned to read for these clauses, and a quotation that insists on a credit with an acceptance certificate is telling you something about the last buyer who did not pay.
What the terms cost, in numbers
Put the instruments on the same order and the trade-off becomes visible. Take fifty thousand dollars of goods, first order, supplier with no trading history with this buyer.
Thirty per cent in advance exposes fifteen thousand dollars from day one. Payment against documents exposes the balance from the day of shipment, and in practice the buyer’s money is out before the container arrives by four to six weeks. A letter of credit costs a fraction of a per cent to a per cent and a half depending on the bank, the tenor and how clean the documents are, plus amendments for every discrepancy — call it a few hundred dollars on this order — and it removes the payment risk without touching the quality risk.
Open account thirty days costs the seller the financing and the risk, and both appear in the price as a margin the buyer never sees as a line item. On a first order from an unknown buyer, that margin is usually large, which is why the “cheapest” quotation is often the one asking for the largest deposit.
The comparison is not which instrument is cheapest. It is which risk the buyer is able and willing to carry: capital at risk before delivery, or a price that includes somebody else carrying it. A buyer with cash and no leverage should be buying certainty with a credit. A buyer with leverage and a long relationship should be buying price with open account — though the relationship has to be worth more than the terms, which is a calculation this series has covered from the other side. A buyer doing neither is paying for the worst of both.
Insurance covers the balance sheet, not the specification
Export credit insurance is widely misunderstood in the same direction as the letter of credit. It protects the seller against a buyer who does not pay, and in some products against a buyer who cannot. It does not protect anyone against goods that fail to meet the specification, and it does not resolve a dispute about quality — most policies exclude it explicitly.
For the buyer, the corresponding instrument is a payment guarantee or an advance payment guarantee from the supplier’s bank, which returns the deposit if the supplier fails to perform. These are cheap relative to the exposure and almost never requested on small orders, which is precisely the size of order where the supplier’s failure would hurt most.
Both instruments share a property worth remembering: they price a financial risk, and they are silent about the physical one. The physical risk — that the goods are what the sample showed — is managed by the sample and the signed reference, by the audit before the order, and by inspection before shipment. No payment term substitutes for any of them.
Six terms, and what each one actually transfers
The table reads across the instruments. The third column is the risk that stays with the buyer; the fourth is what it costs.
| Term | Risk moved to | Risk that stays with the buyer | Typical cost |
|---|---|---|---|
| Full advance payment | The supplier, for nothing | Non-delivery and wrong goods, entirely | Zero fee, maximum exposure |
| Deposit plus balance against documents | The bank, briefly | Quality, and the gap between shipment and arrival | Financing cost inside the price |
| Letter of credit, documents only | The issuing bank | Quality; the credit checks paper | A few hundred to a few thousand dollars |
| Letter of credit with inspection certificate | The bank, plus an independent inspector | What the inspector did not sample | Credit fee plus inspection fee |
| Documentary collection | Nobody; the bank only handles documents | Everything until the goods are released | Low fee, high exposure |
| Open account | The seller, and its insurer | Nothing financial; quality still unresolved | A margin built into the price |
Read the third column as the residual. Every instrument leaves something with the buyer, and the residual is always the same thing: whether the goods are what they were supposed to be. That is why the payment negotiation and the quality negotiation are the same negotiation, conducted by different people in the same company, usually without talking to each other.
The long pole is decided at quotation, not at contract
By the time the contract is drafted, the payment term has already been priced. A supplier who assumed thirty per cent advance has built that assumption into the unit price, and a buyer who negotiates it down at signature is negotiating against a number that already includes it.
The useful moment is earlier, when the quotation is being read. The same discipline that applies to freight applies here: ask what the term assumes, and what changes if the assumption is wrong. A quotation that offers open account to a first-time buyer is either mispriced or planning to recover the risk some other way.
Three clauses close most of the exposure on a first order, and none of them costs money. Say when the documents are released, not just that payment is against them. Say what happens if the shipment is late, in days and in money. And say who inspects, at which stage, against which signed reference — because that is the only clause that addresses the risk every payment term leaves behind.
Payment terms look like a cash-flow conversation and are actually a statement about trust: how much of it exists, who is extending it, and what it costs to buy more. The supplier’s price contains an estimate of the buyer’s reliability, and the buyer’s terms contain an estimate of the supplier’s. On a first order both estimates are guesses, which is why the instruments exist — and why the ones that look cheapest are usually the ones that transfer the least. The document comparison across markets covers what has to be filed; this is about who is holding the money while it is being filed.
How much of the exposure exists at all depends on order size — a first order carries costs that do not divide evenly, which is why its unit price is not the quoted one.
Which party is out of pocket while the box is released but the consignment is not collectable is fixed earlier than the voyage, in the payment terms that allocate the risk.